Block 15/06 East Hub
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Emissions
- FPSO
- Drilling
- Exploration costs
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) File
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapBlock 15/06 - East Hub mapCurrent Block participation
-
Field hydrocarbon and reservoir characteristicsBlock 15/06 East Hub well dataReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
PM12 (MASA fields)
The PM12 PSC covers a group of fields located offshore Peninsular Malaysia. The Duyong gas field was brought onstream first, initially ...
$3,720PM9
The PM9 Production Sharing Contract (PSC) covers five offshore fields in Peninsular Malaysia: Bekok, Pulai, Tiong, Tinggi, and Kepong. ...
$3,720Latin America upstream in brief
The Latin America upstream in brief provides the Wood Mackenzie view on key industry events in Central and South America as they unfold.
$6,750