Block 62 (Tarapoa)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Andes Petroleum secures contract extension until 2040
- Reservoirs
- Hydrocarbon quality
- Emissions
- Wells
- Capital costs
- Operating costs
- Cash flow
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsDiscovery Summary
-
Reserves (2P) at 01/01/2026Production (2015-2024)Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 62 (Habiba)
The Occidental operated Block 62 (Habiba) contract area is located in central Oman, adjacent to PDO's prolific producing Kauther gas field.
$3,720Block 09-3/12 (Ca Tam)
Block 09-3/12 is located in the Cuu Long Basin and contains the Ca Tam field. Production from the field started in January 2019.
$3,720Juma-Bashikurd (Totimaidan block)
The large Totimaidan block contains the undeveloped Juma and Bashikurd sour gas fields and significant exploration acreage, extending ...
$3,720