Block 7
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Oso field offered in 2018 E&P bidding round
- Location maps
-
Participation
- History
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- Emissions
-
Development
- Wells
- Facilities
- Infrastructure
-
Costs
- Capital costs
- Operating costs
- 4 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Block 7 production profile
- Coca-Payamino production profile
- 19 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Rampside Gas Terminals
The three Rampside Gas terminals (Barrow North, Barrow South and Rivers) lie on the Cumbria coastline, three kilometres southeast of ...
$2,580Brent
The giant Brent oil and gas field in the far north of the UKCS was discovered in 1971 and confirmed the North Sea as a world class oil ...
$3,720Elk/Antelope (Papua LNG)
Papua LNG is a proposed, Total-operated LNG facility, fed by the Elk/Antelope field and located on the east coast of the Gulf of Papua.
$6,900