Block Z-1
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Full development delayed
- Exploration upside
- Community relations
- Historic
- Structure
- Reservoir
- Corvina
- Albacora
- Piedra Redonda and Delfin
- Gas to power project
- Capital costs
- Operating costs
- Cash flow
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Michilla Restart SxEw copper mine
A detailed analysis of the Michilla Restart SxEw copper mine project.
$2,250Ewing Bank 878
Ewing Bank 878 is a small oil and gas field located in the Ewing Bank protraction area. The field was initially developed as a two-well ...
$3,720Morecambe South
Morecambe South is a gas field located in the East Irish Sea.
$3,720