Camarupim
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- BW plans a potential tie-back development of Camarupim to Golfinho
- FPSO production capacity
- History
- Local content
- Structure
- Reservoir
- Capital costs
- Lease costs
- Liquids
- Gas
- Cash Flow
- Global Economic Model (GEM) file
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
- Field Hydrocarbon Characteristics
- Reserves (2P) at 01/01/2025
- Production (2009-2015)
- Production Profile
- Platform Summary
- Capital Costs 2007 to 2016 (US$ million)
- Operating Costs 2014 to 2023 (US$ million)
- Annual Gas Prices
- Cash Flow (US$)
- PV Table (US$)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Golfinho & Canapu
Golfinho is a deepwater field operated 100% by BW Energy in the Espirito Santo basin.
$3,720Parque dos Doces
Parque dos Doces comprises the joint development of three fields located in the Espírito Santo basin, immediately to the east of ...
$3,720Espirito Santo Basin - Other Fields
The Espírito Santo Basin - Other Fields are low priority assets for Petrobras due to their small sizes. The offshore assets, ...
$3,720