Asset report

Carabobo Project 1

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Carabobo Project 1 covers two blocks, Carabobo-1 Norte and Carabobo-1 Central. The blocks are located in the eastern area of Venezuela's Orinoco Heavy Oil Belt (also as known as the Faja) and neighbour the Petromonagas (Cerro Negro) heavy oil project. The Faja is the world's largest heavy oil deposit with oil in place of 1,300 billion barrels. The project began production in December 2012.

What's included

This report contains

  • Document

    Carabobo Project 1

    PDF 4.50 MB

  • Document

    Carabobo Project 1

    XLS 480.00 KB

  • Document

    Carabobo Project 1

    ZIP 4.89 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
    • Upgrader plans cancelled
    • Lower peak expected
    • Diluent imports crucial for success
    • Negative NPV
  • Location maps
    • Historic
    • Reservoirs
    • Recovery factors and enhanced oil recovery
    • Structure
  • Exploration
  • Reserves and resources
  • Production
    • Wells
    • Facilities
    • EOR
  • Infrastructure
    • Capital costs
    • Operating costs
  • Sales contracts
    • Royalty
    • Corporate income taxes
    • Windfall taxes
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 19 images and tables including:

Images

  • Index Map
  • Detail Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Geology: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Block XIII

Asset report

El Dorado

Asset report

Itau

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898