Asset Report

Easington/Dimlington Gas Terminals

Get this report

$2,150

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Easington gas terminal site consists of four separate plants, located to the north of Easington village in Humberside.Perenco Easington and Dimlington TerminalsThe Easington and Dimlington terminals are 100% owned and operated by Perenco. These terminals collect gas from around 20 fields in the Southern Gas Basin.Centrica Rough TerminalCentrica Storage, a subsidiary of Centrica, owns 100% of and operates the Rough terminal, which houses the processing facilities for the Rough storage ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Terminals
      • Perenco Easington and Dimlington Terminals
      • Centrica Rough Processing Facility
    • Current pipelines
      • Cleeton System
      • West Sole System
      • Rough System
      • Humber Gathering System (HGS)
    • Ceased pipelines
      • Amethyst System
  • Throughput

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Easington/Dimlington terminals
  • Throughput: Table 1
  • Throughput: Table 2
  • Development: Table 1

What's included

This report contains:

  • Document

    Easington/Dimlington Gas Terminals

    PDF 1.88 MB

  • Document

    Easington/Dimlington Gas Terminals

    XLS 240.50 KB