Easington/Dimlington Gas Terminals
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
-
Development
-
Terminals
- Perenco Easington and Dimlington Terminals
- Centrica Rough Processing Facility
-
Current pipelines
- Cleeton System
- West Sole System
- Rough System
- Humber Gathering System (HGS)
-
Ceased pipelines
- Amethyst System
-
Terminals
- Throughput
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Easington/Dimlington terminalsThroughput: Table 1Throughput: Table 2Development: Table 1
What's included
This report contains:
Other reports you may be interested in
Babbage
The Babbage gas field was developed using a not-normally-manned (NNM) platform, tied back via the West Sole infrastructure 28 ...
$3,720Cleeton Area
The Cleeton Area comprises four oil and gas/condensate field groupings: Ceres & Eris, Cleeton & Ravenspurn South, Easington ...
$3,720Subsurface and Licensing in brief
Rolling coverage and analysis of key E&A activity, licensing, breakthrough technologies, and other subsurface events.
$1,300