Asset Report

Facility - Devils Tower Spar

Get this report

$2,150

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Devils Tower facility is a truss spar located in the Mississippi Canyon protraction area of the Central Gulf of Mexico. Construction of the spar began in June 2001 and installation was finished in November 2003. First production was achieved in May 2004.The spar currently hosts production from four fields: Devils Tower, Triton/Goldfinger and Kodiak. Triton/Goldfinger and Bass Lite were developed as wet-tree subsea tie-backs to the spar, and came onstream in December 2005 and February ...

Table of contents

Tables and charts

This report includes 15 images and tables including:

  • Key facts: Table 1
  • Map
  • Participation: Table 1
  • Liquids Throughput
  • Liquids Throughput Profile
  • Gas Throughput
  • Gas Throughput Profile
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2023
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2023)
  • Costs: Table 1

What's included

This report contains:

  • Document

    Facility - Devils Tower Spar

    PDF 2.77 MB

  • Document

    Facility - Devils Tower Spar

    XLS 445.50 KB