Facility - King's Quay
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- GC 433
-
Development
- Key development metrics
- Throughput
- Infrastructure
-
Costs
- Operating Costs
- Tariff Receipts
- Fiscal and regulatory
- Economic assumptions
- Economic analysis
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1MapParticipation: Table 1
-
Throughput: Table 1Liquids Throughput ProfileThroughput: Table 2Gas Throughput ProfileCosts: Table 1Costs: Table 2Economic analysis: Table 1Economic analysis: Table 2Economic analysis: Table 3
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Samurai
Samurai is a mid-size oil and gas discovery located in the eastern part of the Green Canyon protraction area in 1,033 metres of water.
$3,720Facility - Marco Polo TLP
The Marco Polo TLP has been in operation since July 2004. It is located in Green Canyon block 608 in 1,320 metres (4,300 feet) of ...
$2,580Metates zinc mine project
A detailed analysis of the Metates zinc mine project.
$2,250