Facility - Marco Polo TLP
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
-
Development
- Platform
- Hull & Mooring
- Topsides
- Integration & Installation
-
Throughput
- Liquid Throughput
- Gas Throughput
- Infrastructure
-
Costs
- Capital Costs
- Capital Receipts
- Operating Costs
- Tariff Receipts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes the following images and tables:
-
Key facts: Table 1Facility MapParticipation: Table 1
-
Economic analysis: Table 1Economic analysis: Table 2Economic analysis: Table 3Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Revenue Distribution (Discounted at 10% from 01/01/2026)Throughput: Table 1Liquids Throughput Profile
- 3 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Marco Polo (GC 608)
Marco Polo (GC 608) is an oil field located in southeastern Green Canyon. The field has been developed by Anadarko via a third-party ...
$3,720K2
K2 is a large subsalt oil field located in southeastern Green Canyon. The K2 structure extends across several blocks, which were not ...
$3,720Genghis Khan (GC 652)
Genghis Khan (GC 652) makes up the western flank of the Shenzi structure in the southeastern corner of the Green Canyon protraction ...
$3,720