Asset report

Facility - Marco Polo TLP

From

$1,250.00

Get this report

From

$1,250.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Marco Polo TLP has been in operation since July 2004. It is located in Green Canyon block 608 in 1 320 metres (4 300 feet) of water. At the time of its installation in December 2003 it was the deepest tension leg platform (TLP) in the Gulf of Mexico. However this record was surpassed when the Magnolia TLP was installed in 2004 (see separate analysis). The Marco Polo facility is owned by Deepwater Gateway LLC a joint venture comprising Enterprise Products Partners (50%) and Genesis ...

What's included

This report contains

  • Document

    Facility - Marco Polo TLP

    PDF 1.13 MB

  • Document

    Facility - Marco Polo TLP

    XLS 381.00 KB

  • Document

    Facility - Marco Polo TLP

    ZIP 1.44 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Development
  • Throughput
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 15 images and tables including:

Images

  • Facility Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2017
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2017)
  • Liquids Throughput Profile
  • Gas Throughput Profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Throughput: Table 1
  • Throughput: Table 2
  • Costs: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898