Asset report

Gassled-Europipe I

From

$1,250.00

Get this report

From

$1,250.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Europipe I runs 660 kilometres from the Draupner E riser platform to a receiving terminal at Dornum in Germany. The gas is then transported via a 48 kilometre onshore pipeline to the metering station at Emden. It was the third major transmission system constructed to deliver Norwegian gas to continental Europe. Following the unitisation of the Norwegian gas export system that became effective at the start of 2003 Europipe I is now part of Gassled. This analysis covers the historical ...

What's included

This report contains

  • Document

    Gassled-Europipe I

    PDF 746.43 KB

  • Document

    Gassled-Europipe I

    XLS 94.50 KB

  • Document

    Gassled-Europipe I

    ZIP 813.21 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
  • Development
  • Throughput
  • Costs
  • Fiscal and regulatory
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Europipe I Map

Tables

  • Key facts: Table 1
  • Participation: Table 1

You may be interested in?

Asset report

Loma Negra Area

Asset report

El Trapial Area

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898