Gassled-Vesterled
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary
- Gassled pipeline network could be nationalised
- Location maps
- Participation
- Development
-
Throughput
-
Tariffs
- Gassled
-
Tariffs
-
Costs
- Capital Costs
- Operating Costs
- Fiscal and regulatory
- Economic assumptions
Tables and charts
This report includes 3 images and tables including:
- Key facts: Table 1
- Vesterled Map
- Participation: Table 1
What's included
This report contains:
Other reports you may be interested in
Gassled-Europipe I
Europipe I runs 660 kilometres from the Draupner-E riser platform, to a receiving terminal at Dornum in Germany.
$2,150Gassled-Europipe II
Europipe II is a dry gas export pipeline. It runs from Kårstø in Norway to Dornum in Germany.
$2,150Gassled-Langeled
The Langeled system is one of the longest subsea gas export lines in the world and connects the Nyhamna terminal to the UK.
$2,150