Gassled-Zeepipe
Report summary
Table of contents
- Key facts
- Summary
- Location maps
- Participation
-
Development
- Development:
- Phase I
- Phase IIA & IIB
- Terminal
-
Throughput
-
Tariffs
- Gassled
-
Tariffs
-
Costs
- Capital Costs
- Operating Costs
- Fiscal and regulatory
- Economic assumptions
Tables and charts
This report includes 3 images and tables including:
- Key facts: Table 1
- Zeepipe Map
- Participation: Table 1
What's included
This report contains:
Other reports you may be interested in
20 September 2021
Gassled-Zeepipe Terminal Zeebrugge
Gassled-Zeepipe Terminal Zeebrugge
The Zeebrugge terminal receives gas, via Zeepipe, from fields such as Troll and Sleipner.
$2,15008 October 2021
Gassled-Europipe I
Gassled-Europipe I
Europipe I runs 660 kilometres from the Draupner-E riser platform, to a receiving terminal at Dornum in Germany.
14 February 2022
Gassled
Gassled
Gassled is the unitised Norwegian gas export network.
$4,400