Asset Report

Greater Catcher Area

Get this report*

$5,280

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Greater Catcher Area includes the Catcher, Varadero and Burgman fields. The development lies 20-kilometres southwest of Bittern, in the Central North Sea. The fields are tied-back to the leased BW Catcher FPSO. The project was sanctioned in June 2014. Catcher, Varadeo, and Burgman were developed with subsea wells, tied back to the FPSO. Production start-up was phased, with Catcher brought onstream in December 2017, Varadero in January 2018, and Burgman in May ...

Table of contents

  • Summary
    • Harbour acquires Waldorf Production, increasing its interest in the Catcher Area
    • Upside from exploration and nearby field discoveries
    • Catcher
    • Varadero
    • Burgman
  • Decommissioning costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) file
    • Burgman
  • Varadero

Tables and charts

This report includes the following images and tables:

    Capital Costs 2031 to 2037 (US$ million)Operating Costs 2026 to 2030 (US$ million)Cash Flow (US$)
    PV Table (US$)Summary Table (US$)Cash flow (US$ million)Cash flow PV (US$ million)Summary Table (US$)Cumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining PV Price SensitivitiesIndex map
  • 16 more item(s)...

What's included

This report contains:

  • Document

    Greater Catcher Area

    PDF 1.24 MB

  • Document

    Greater Catcher Area

    PDF 3.61 MB