Greater Stella Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Energy Profits Levy casts doubt over further development
- Cessation of production expected in 2027
- Decarbonisation
- Isabella discovery now unlikely to be tied-back to FPF-1
- Future drilling
- Historical drilling
-
Key development metrics
- Wells
- Subsea
- FPU
-
Capital costs
- Stella
- Harrier
- Vorlich
- Abigail
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Stella
- Harrier
- Vorlich
- Abigail
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2027 to Post-2034 (£ million)Operating Costs 2018 to 2027 (US$ million)Index map
-
Greater Stella Area mapParticipationField hydrocarbon characteristicsReserves (2P) at 01/01/2026Production (2018-2022)Greater Stella Area production profilePlatform summaryPipeline summary
- 32 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Greater Armada Area
The Greater Armada Area lies 35 kilometres east of Britannia Area, and includes the Fleming, Drake, Hawkins, Seymour and Maria fields. ...
$3,720Greater Catcher Area
The Greater Catcher Area includes the Catcher, Varadero and Burgman fields. The development lies 20-kilometres ...
$5,280GEMS Area (Netherlands)
ONE-Dyas operates the cross-border GEMS Area (Greater Ems Area) gas development in the Dutch and German sectors of the southern North ...
$3,720