Greater Stella Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Cessation of production in March 2026
- FPS-1 no longer a potential host facility for the Isabella discovery
- Historical drilling
- Wells
- Subsea
- FPU
-
Capital costs
- Stella
- Harrier
- Vorlich
- Abigail
- Decommissioning costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
-
Cash flow
- Stella
- Harrier
- Vorlich
- Abigail
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2026 to 2033 (£ million)Operating Costs 2018 to 2026 (US$ million)Index map
-
Greater Stella Area mapParticipationField hydrocarbon characteristicsReserves (2P) at 01/01/2026Production (2017-2021)Greater Stella Area production profilePlatform summaryPipeline summary
- 16 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Greater Catcher Area
The Greater Catcher Area includes the Catcher, Varadero and Burgman fields. The development lies 20-kilometres ...
$5,280Azulao Area
The Azulão Area consists of Eneva's operated fields in the north region of Brazil.The area encompasses Azulão, ...
$3,720Guarrojo Area
The Guarrojo block in the Llanos basin was awarded to Hocol in February 2006. As the company is an Ecopetrol subsidiary, it operates ...
$3,720