Gullfaks Sør
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Field recovery rates
- Hywind Tampen is fully operational
- Snorre electrification plans scrapped
- Emissions
-
Summary
- Gullfaks Sør, Gullveig and Rimfaks
- Timescales
- Development plan
- Phase 1
- Phase 2
- Skinfaks
- Gulltopp
- Gullfaks 2030 projects
- 5 more item(s)...
- Capital costs
- Decommissioning costs
-
Operating costs
- Emissions taxes
- Cash flow
- NGL price
- Fiscal terms
- Global Economic Model (GEM) File
- Cash Flow
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Capital Costs Pre-2016 to 2024 (NKr million)Capital Costs 2035 to 2039 (NKr million)Cash Flow (US$)
-
PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash Flow (Local Currency)PV Table (Local Currency)Summary Table (Local Currency)
- 18 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Fram Sør
The Fram Sør fields are north of Troll in the Northern North Sea. The subsea development will be tied back to the Troll C platform.
$3,720Oseberg Sør Area
Oseberg Sør is an accumulation of several structures that have been brought onstream in phases.
$5,280Visund Area
Visund Area is made up of five fields: Visund, Visund Nord, Visund Sør, Rhea and Titan. It is located 20 kilometres east of ...
$5,280