Heidrun
Report summary
Table of contents
- Summary
-
Key Issues
- Heidrun Extension Project FID is expected in 2025
- Lifetime Extension project supports continued production
- Future drilling required to maintain production
- Increased gas production to continue
- Further exploration upside
- Decarbonisation - Heidrun platform could be electrified
- Unitisation
- Emissions
- Recent development
- Alpha Horst
- Heidrun Subsea Extension
- Lifetime Extension project
- Oil
- Gas
- Capital costs - Heidrun
- Capital costs - Alpha Horst
- 12 more item(s)...
Tables and charts
This report includes the following images and tables:
- Field characteristics
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production profile
- Platform summary
- Pipeline summary
- Capital Costs 2015 to 2024 (NKr million)
- Capital Costs 2021 to 2024 (NKr million)
- Capital Costs 2025 to 2028 (NKr million)
- 14 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Haltenpipe
Haltenpipe is a rich gas pipeline system constructed to transport gas from the Heidrun field located offshore Mid Norway.
$2,580Skarv Area
The Skarv Area is located between the large Heidrun and Norne fields in the Halten Terrace area of the Norwegian Sea.
$5,280Dvalin Area
Dvalin is a high pressure, high temperature (HP/HT) gas field, located in the Norwegian Sea.
$5,280