Huizhou Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Emissions
- Huizhou 32-5 Adjustment Plan & Huizhou 33-1
- Huizhou 26-6 oil and gas development
- Further details
- Readjustment project
- Huizhou 19-6 oil field
- Exploration Costs
-
Operating Costs
- Block 16/08
- Block 16/19
- Huizhou 25-4
- Cash Flow
- Global Economic Model (GEM) file
-
Cash Flow
- Block 16/08D
- Block 16/19
- Huizhou 25-4
Tables and charts
This report includes the following images and tables:
-
Index MapHuizhou Area MapParticipation
-
Block 16/08Block 16/19and Huizhou 25-4Reserves (2P) at 01/01/2026Production (2015-2024)Production Profile - Huizhou 16/08Production Profile - Huizhou 16/19Production Profile - Huizhou 25-4Exploration Costs 2017 to 2025 (US$ million)Capital Costs Pre-2016 to 2024 (US$ million)
- 22 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Contract 1 Area (Ceased)
The contract 1 Area, previously known as the Unocal 1 Contract Area, was the first offshore gas project in the Gulf of Thailand. ...
$3,720Marlim and Voador Area
The giant Marlim oil field was developed as a high priority asset for Petrobras. It was the largest field in terms of reserves until ...
$3,720Shurtan Area
State-owned Uzbekneftegaz (UNG) operates the Shurtan Area, which is centred on the giant, albeit mature, Shurtan gas field and related ...
$3,720