Asset report

Jannah Contract Area (Block 5)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Jannah Contract Area (Block 5) comprises five fields within three discrete blocks adjacent to the Marib Jawf contract area central Yemen. The fields now operated by Kuwait Energy Company (KEC) began producing in the late 1990s and were entering the latter stages of their productive lives prior to the suspension of operations in early 2015. Production was also shut in for a large part of 2011 and 2012 due to sabotage of the export pipeline. Operations in Block 5 were suspended in ...

What's included

This report contains

  • Document

    Jannah Contract Area (Block 5)

    PDF 3.47 MB

  • Document

    Jannah Contract Area (Block 5)

    XLS 714.50 KB

  • Document

    Jannah Contract Area (Block 5)

    ZIP 4.07 MB

Table of contents

  • Key facts
    • Summary
      • Issues common to the Marib fields, West Yemen
      • Issue specific to Jannah Contract Area (Block 5)
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
    • Technical reserves
    • Gas
  • Production
  • Development
  • Infrastructure
    • Exploration and Appraisal Costs
    • Capital Costs
    • Operating Costs
    • Royalty
    • Cost Oil/Gas
    • Profit Oil/Gas
    • Income Tax
      • Signature Bonuses
      • Production Bonuses
      • Other Bonuses
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • Jannah (Block 5) Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Reserves and resources: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3

You may be interested in

Asset report

Tuba

Asset report

Qaiyarah and Najmah

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898