Asset report

Jenein Nord Development

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Jenein Nord block is located immediately west of Eni's Adam concession in the Ghadames Basin in Southern Tunisia. Twelve discoveries have been made to date on the concession between 1988 present. Production began in 2007 and was initially processed at temporary facilities located on the fields. In 2010 Pioneer completed the installation of permanent facilities with a processing capacity of 20 000 b/d. Production is transported via a purpose built spur line to the TRAPSA pipeline which carries the crude to the Zarzaitine export port of La Skhira. Gas production started in 2014 initially using the El Borma Gabes gas line. Larger volumes of gas will be transported via a 350 mmcfd pipeline as part of the Nawara development. In January 2011 OMV acquired the asset as part of the US$839 million corporate acquisitions of Pioneer Tunisia. The deal was completed on February 18 2011 and OMV assumed operatorship of the company.

What's included

This report contains

  • Document

    Jenein Nord Development

    PDF 5.30 MB

  • Document

    Jenein Nord Development

    XLS 663.50 KB

  • Document

    Jenein Nord Development

    ZIP 5.86 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • Jenein Nord Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Production Profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Sales contracts: Table 1
  • Fiscal and regulatory: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4

You may be interested in

Asset report

West El Manzala

Asset report

Chouech Es Saida

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898