Verdande Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Exploration opportunities add upside potential
- Future drilling
- Historical drilling
- Emissions
- Oil
- Gas
- Capital costs
- Decommissioning costs
-
Operating costs
- Transportation costs
- Emissions taxes
- Cash Flow
- Cash flow (US$ million)
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Reserves (2P) at 01/01/2026Production (2025-2034)Verdande Area production profile
-
Pipeline summaryCapital Costs 2022 to 2025 (NKr million)Capital Costs 2036 to 2038 (NKr million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
CPO 5 Area
The CPO-5 block is a prominent oil and gas exploration and production area located in Colombia's Llanos Basin, a prolific ...
$3,720Gryphon Area
The Gryphon Area is comprised of four fields: Gryphon, Maclure, Tullich and Ballindalloch. The grouping is located within the prolific ...
$3,720Shurtan Area
State-owned Uzbekneftegaz (UNG) operates the Shurtan Area, which is centred on the giant, albeit mature, Shurtan gas field and related ...
$3,720