Kayab-Pit
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Production (2026-2035)Production ProfileCapital Costs 2024 to 2033 (US$ million)Operating Costs 2026 to 2035 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sole Pit (excl. Galleon)
The Sole Pit Area comprises the Barque, Barque South, Clipper and Skiff gas fields. The Sole Pit fields have been developed in phases. ...
$3,720Getty copper mine project
A detailed analysis of the Getty copper mine project.
$2,250Buenavista zinc mine
A detailed analysis of the Buenavista zinc mine project.
$2,250