Asset report

Masela (Abadi) (LNG)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Masela PSC contains the giant Abadi gas field located in the Timor Sea. The field was discovered by INPEX in 2000. Appraisal drilling in 2007 2008 and 2013 2014 has confirmed total recoverable reserve estimates in the region of 22 tcf of gas. In April 2015 the partners submitted a PoD for a 7.5 mmtpa FLNG development concept. In March 2016 the Indonesian government rejected the FLNG concept in favour of an onshore LNG development on the basis that onshore development would bring greater benefit to local communities and enable a higher local content. Given the number of uncertainties surrounding the development of Abadi we believe it is unlikely that FID can be achieved before 2020 or first LNG production before 2026.

What's included

This report contains

  • Document

    Masela (Abadi) (LNG)

    PDF 6.35 MB

  • Document

    Masela (Abadi) (LNG)

    XLS 234.50 KB

  • Document

    Masela (Abadi) (LNG)

    ZIP 6.53 MB

Table of contents

Tables and charts

This report includes 7 images and tables including:

Images

  • Index Map
  • Detail Map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Economic analysis: Table 1

You may be interested in

Asset report

South Jambi B

Asset report

NSO/NSO Extension

Asset report

Weizhou Area

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898