Asset Report

MLNG Dua upstream fields

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The MLNG Dua PSC was signed in June 1993 and covers 11 gas/condensate fields offshore Sarawak. Production from the PSC began in December 1995 when the M3 field was brought onstream. Since then, the M1, M4, B11, B12, Shallow Clastics and M3 South fields have also been developed. Gas is piped to the Bintulu LNG terminal, where it is used as feedstock for the MLNG Dua plant. Interim gas supplies have also been supplied to the MLNG Tiga plant as production built up from ...

Table of contents

  • Summary
  • Key Issues
    • The M Fields - Facilities
    • The B Fields - Facilities
    • Shallow Clastics - Facilities
    • Other Fields - Facilities
  • Exploration Costs
    • Upstream transfer price - legacy fields
    • Upstream transfer price- Malaysia Reference Price (MRP)
    • PETROS as gas aggregator
  • Other Assumptions
  • Cash Flow
  • Condensate Price
  • Gas Price
  • Global Economic Model (GEM) file
    • MLNG Dua PSC Cash Flow.
    • M3 South Cash Flow.

Tables and charts

This report includes the following images and tables:

    Index MapDetail MapParticipation
    Reserves (2P) at 01/01/2026Production (2020-2028)Production ProfileCapital Costs 2020 to 2024 (US$ million)Operating Costs 2025 to 2028 (US$ million)MLNG Dua Gas PricesMLNG Tiga Gas PricesCash Flow (US$)
  • 12 more item(s)...

What's included

This report contains:

  • Document

    MLNG Dua upstream fields

    PDF 3.86 MB

  • Document

    MLNG Dua upstream fields

    PDF 2.54 MB