Asset Report

MLNG Dua upstream fields

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The MLNG Dua PSC was signed in June 1993 and covers 11 gas/condensate fields offshore Sarawak. Production from the PSC began in December 1995 when the M3 field was brought onstream. Since then, the M1, M4, B11, B12, Shallow Clastics and M3 South fields have also been developed. Gas is piped to the Bintulu LNG terminal, where it is used as feedstock for the MLNG Dua plant. Interim gas supplies have also been supplied to the MLNG Tiga plant as production built up from ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • The M Fields - Facilities
    • The B Fields - Facilities
    • Shallow Clastics - Facilities
    • Other Fields - Facilities
  • Infrastructure
    • Exploration Costs
    • Capital Costs
  • 4 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production Profile
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • 16 more item(s)...

What's included

This report contains:

  • Document

    MLNG Dua upstream fields

    PDF 6.50 MB

  • Document

    MLNG Dua upstream fields

    XLS 896.50 KB