Moho-Bilondo (Haute Mer Zone D)
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
-
Phase 1E
- Floating Production Unit (FPU)
- Drilling and subsea
- Umbilicals and flowlines
- Pipeline
-
Phase 1Bis
- FPU
- Drilling
- Umbilicals and flowlines
-
Moho Nord
- FPU and TLP
- Drilling
- Subsea systems
- Pipeline
- Recent and future development
- Capital costs
-
Operating costs
- Tariff
- Cash flow
- Global Economic Model (GEM) file name
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapMoho-Bilondo mapParticipation
-
Field characteristicsKey wellsReserves (2P) at 01/01/2026Production (2015-2024)Production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)Cash Flow (US$)PV Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Yaramoko gold mine
A detailed analysis of the Yaramoko gold mine.
$2,250Arman
The Arman heavy oil field is owned and operated by Hong Kong-registered Leader Way Corporation. It is located in southwest Kazakhstan ...
$3,720PERTAMINA ASSET 5 - Kalimantan
This report contains the PERTAMINA EP (PEP) operated Asset 5 areas in Kalimantan - Sangatta, Sanga Sanga (not to be confused with the ...
$3,720