Narrabri Gas Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Wells
- Type curve
- Water handling and pond
- Processing equipment
- In field pipelines
- Sunk Costs
-
Capital costs
- Wells
- Water handling and reverse osmosis
- In-field pipelines
- Gas processing facilities
- Infield processing equipment
- Ecological Offsets (other capex & other opex)
-
Operating costs
- Wilga Park Power Station pilot gas sales contract
- Sales contracts
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapNarrabri Gas Project Detail MapParticipation
-
Reserves (2P) at 01/01/2026Production (2016-2025)Production ProfileOperating Costs 2026 to 2035 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Surat Gas Project (Arrow)
The Surat Gas Project is a coal seam gas development in the Surat Basin, southeast Queensland. The project is operated by Arrow Energy.
$3,720Nearshore Otway Gas Project (Halladale, Enterprise)
The Nearshore Otway Gas Project (Halladale, Speculant, Black Watch and Enterprise) is located around 4 km from the Victorian coast.
$3,720Otway Gas Project
The Otway project consists of 205 TJ/d (195 mmcfd) onshore gas processing facility and the Geographe and Thylacine gas fields.
$3,720