Narrabri Gas Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Wells
- Type curve
- Water handling and pond
- Processing equipment
- In field pipelines
- Sunk Costs
-
Capital costs
- Wells
- Water handling and pond
- In-field pipelines
- Processing equipment
- Infield processing equipment
-
Operating costs
- Wilga Park Power Station pilot gas sales contract
- Sales contracts
- Cash Flow
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
- Index Map
- Narrabri Gas Project Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production Profile
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- Split of Revenues
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Peru upstream summary slides
To complement our more detailed Peru upstream summary we provide a slide-pack of the key issues in the country.
$4,080North Malay Basin Gas Project
The North Malay Basin Gas Project comprises a collection of gas fields offshore Peninsular Malaysia, bordering the Malaysia-Thailand ...
$3,720Surat Gas Project (Arrow)
The Surat Gas Project is a coal seam gas development in the Surat Basin, southeast Queensland. The project is operated by Arrow Energy.
$3,720