North Malay Basin Gas Project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- PM301 and PM302
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- North Malay Basin Gas Project (PM302)
- Bumi
-
Development
- Key Development Metrics
- Bumi
- Infrastructure
-
Costs
- Exploration costs
- Capital costs
- Operating costs
-
Sales contracts
- Upstream transfer price - Malaysia Reference Price (MRP)
-
Fiscal and regulatory
- PM301 and PM302
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM) file
-
Economic analysis
-
Cash flow
- North Malay Basin Gas Project
- Bumi (PM301)
-
Cash flow
Tables and charts
This report includes 36 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Well data: Table 1
- Reserves and resources: Table 1
- Participation: Table 1
- Production: Table 1
- Production: Table 2
- North Malay Basin Gas Project (PM302) Production Profile
- Production: Table 3
- Production: Table 4
- Bumi (PM301) Production Profile
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Sales contracts: Table 1
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Fiscal and regulatory: Table 3
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Economic analysis: Table 4
- Economic analysis: Table 5
- Economic analysis: Table 6
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
What's included
This report contains:
Other reports you may be interested in
Bongkot
The Bongkot concession included three blocks - B15, B16 and B17 - in the Gulf of Thailand. It comprised of a collection of ...
$5,750Marcellus Key Play
Detailed analysis of Marcellus production, subsurface, well design and operator strategy.
$22,800G2/61 (Bongkot)
Block G2/61, covering 3,247 km2, is located in the Gulf of Thailand. The block is divided into three areas: Area A, Area B1 and Area ...
$3,100