OML 20
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Find out more about our Upstream products
Interested in this report? Explore our Upstream Oil and Gas solutions.
Upstream products and solutions
Report summary
Table of contents
- Summary
-
Key Issues
- Block production
- FTSA may not be implemented
- Gas monetisation
-
Emissions
- Egbema West Gas-to-Power Project
- Capital Costs
-
Operating Costs
- Petroleum Industry Act
- Global Economic Model (GEM)
- Cash Flow
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
-
Capital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 (US$ million)Cash Flow (US$)
-
PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining PV Price SensitivitiesIndex MapOML 20 mapParticipation
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 20 (Pungarayacu)
Pungarayacu is one of the largest undeveloped resources in Latin America with an estimated OOIP up to 12 billion barrels. It is an ...
$3,720Tigzha zinc mine
A detailed analysis of the Tigzha zinc mine.
$2,250Block 16-1 (Te Giac Trang)
Large oil field in the shallow-water Cuu Long Basin, discovered and operated by a joint operating company.
$6,900