PDO Block 6 (Crude)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Contract extension and relinquishments
-
Small field contracts
- Karim Small Fields contract
- Rima Small Fields contract
- Qarat Small Fields
- Lekhwair Small Fields
-
Geology
-
Fahud and Lekhwair Clusters
- Fahud
- Lekhwair
- Natih
-
Yibal Cluster
- Yibal
- Al Huwaisah
-
Qarn Alam Cluster
- Nimr
- Rima
- Saih Rawl
-
Marmul Cluster
- Marmul
-
Fahud and Lekhwair Clusters
- Well data
-
Exploration
- Recent exploration (2020 to present)
- 2010 to 2019
- 2000 to 2009
- 1990 to 1999
- 1980 to 1989
- 1970 to 1979
- 1956 to 1969
-
Reserves and resources
- Oil
- Gas and condensate
-
Production
- Overview
- Oil
- Gas and condensate
-
Production by cluster
- Fahud/Lekhwair
- Yibal
- Qarn Alam
- Marmul/RTQ
- Bahja-Rima Area
- Nimr Area
- Harweel
- Small fields service contracts
- Emissions
-
Development
- Overview
-
Northern directorate
- Fahud and Lekhwair clusters
- Yibal cluster
- Qarn Alam cluster
-
Southern directorate
- Marmul cluster
- Marmul polymer flood project
- RTQ waterflood programme
- Bahja-Rima cluster
- Nimr cluster
- 'Miraah' solar project
- Harweel cluster
-
Small fields service contracts
- Karim
- Rima
- Qarat
- Lekhwair
-
Infrastructure
-
Oil pipelines
- Tariffs
-
Oil pipelines
-
Costs
- Exploration costs
- Capital costs
- Operating costs
-
Fiscal and regulatory
- Royalty
- Income Tax
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
-
Oil price
- Global Economic Model (GEM) File
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 28 images and tables including:
- Key facts: Table 1
- PDO Contract Area (Block 6): By Cluster
- PDO Contract Area (Block 6): Fahud, Lekhwair and Yibal Clusters
- PDO Contract Area (Block 6): Qarn Alam Cluster
- PDO Contract Area (Block 6): Bahja-Rima Cluster
- PDO Contract Area (Block 6): Marmul and Nimr clusters
- PDO Contract Area (Block 6): Harweel and RTQ Clusters
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Oil Production Profile
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2025)
- Remaining Present Value Price Sensitivities
- Infrastructure: Table 1
What's included
This report contains:
Other reports you may be interested in
PDO Block 6 (Gas/Condensate)
Block 6 is Oman's largest and most significant oil and gas operation.
$3,720Al Khalij (Block 6)
Al Khalij is an offshore oil field located 140 kilometres northeast of Doha and 40 kilometres northeast of Halul Island. The field ...
$3,720Europe upstream in brief
Norway’s Troll field produced a record-breaking 42.5 bcm of gas in 2024
$1,350