PEL 91 is an oil development located on the western flank of South Australia's Cooper/Eromanga Basin. It is one of a number of small oil field groupings within the basin that are not part of the Cooper Basin Joint Venture (CBJV). It is around 90 kilometres from the CBJV operated Moomba gas and liquids facility, where processing occurs. Production began in January 2010, but was severely impacted by flooding over the following two years.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Well data
- Reserves and resources
- Production
- Infrastructure
- Costs
-
Fiscal and regulatory
- Royalty
- Onshore PRRT
- Corporate income tax
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Exchange rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 22 images and tables including:
- Key facts: Table 1
- Index Map
- PEL 91 Detail Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
What's included
This report contains:
Other reports you may be interested in
Asset Report
Big Bell (Closed) gold mine
A detailed analysis of the Big Bell (Closed) gold mine.
$2,250
Asset Report
Browns Creek (Closed) gold mine
A detailed analysis of the Browns Creek (Closed) gold mine.
$2,250
Asset Report
PEL 106 B
The PEL 106 B fields are located in the western Cooper/Eromanga Basin, approximately 50 kilometres west-northwest of Moomba.
$3,100