Asset Report

PetroChina Sichuan Shale

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

PetroChina is developing six shale gas projects - Changning, Weiyuan, Zhaotong, Taiyang, Luzhou, and Yuxi. The Lower Silurian Longmaxi Formation is the primary target across the six areas. Official estimates of the in-place shale gas resources of the area exceeds 70 tcf.

Table of contents

  • Summary
  • Key Issues
  • Reserves assumptions
  • Type curve assumptions
  • Reserves methodology
  • Capital Costs
  • Operating Costs
  • Cash Flow
  • Gas price
  • Global Economic Model (GEM) file
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index MapDetail MapParticipation
    Reserves (2P) at 01/01/2026Production (2016-2025)Production ProfileCapital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2026 to 2035 (US$ million)Annual Gas PricesCash Flow (US$)PV Table (US$)
  • 5 more item(s)...

What's included

This report contains:

  • Document

    PetroChina Sichuan Shale

    XLS 670.00 KB

  • Document

    PetroChina Sichuan Shale

    PDF 4.03 MB