Asset report

Qatargas 3 (LNG) - upstream

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Qatargas 3 is a fully integrated North Field LNG project inclusive of reservoir development wellhead production gas liquefaction storage and loading. It was developed jointly with Qatargas 4 and both projects include identical 7.8 mmtpa liquefaction trains located at Ras Laffan industrial city. The production facilities include three wellhead platforms which supply the Qatargas 3 and Qatargas 4 liquefaction trains at Ras Laffan via two 38 inch pipelines. Qatargas 4 is operated under a ...

What's included

This report contains

  • Document

    Qatargas 3 (LNG) - upstream

    PDF 576.57 KB

  • Document

    Qatargas 3 (LNG) - upstream

    XLS 606.00 KB

  • Document

    Qatargas 3 (LNG) - upstream

    ZIP 1.09 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
    • Geological framework
    • Reservoir
    • Well productivity
    • Gas quality
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Upstream Development
      • Gas processing and liquefaction
      • Liquefaction plant construction contracts
      • Common Lean LNG Facility (CLLNG)
      • Common Condensate Storage and Loading Facility (CCSL)
      • Common LPG Facility (CLPG)
      • Common Sulphur Facility (CSF)
      • Jetty boil-off gas recovery project (JBOG)
      • Helium projects
  • Infrastructure
    • Capital Costs
    • Operating Costs
    • China
    • Poland
    • Thailand
    • Japan
    • Portfolio volumes
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
      • Condensate
      • LPG price
    • LNG Price
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

Images

  • Index Map
  • Detail Map - Qatargas 3 LNG project.
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Geology: Table 1
  • Geology: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

South Pars Phase 12

Asset report

Yaran South

Asset report

Zubair

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898