Asset Report

Rough

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Rough gas field was developed and operated by British Gas. Production started in 1976. Five platforms were used, with the field linked to Easington terminal by two 28-kilometre pipelines.In 1985, following assessment of the reservoir's potential, the field was converted to a gas storage facility. Gas from the National Transmission System (NTS) was injected into the reservoir at times of low demand (e.g. summer) and the field provided a peak shaving facility during periods of high ...

Table of contents

    • Rough gas storage reopened in September 2022
    • Plans to redevelop Rough and expand its capacity
    • Potential for Rough to store hydrogen
    • Platforms
    • Wells
  • Decommissioning costs
  • Operating costs
  • Cash Flow
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

  • Operating Costs 2017 to 2022 (£ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2026
  • Remaining PV Price Sensitivities
  • Cash Flow (Local Currency)
  • PV Table (Local Currency)
  • Summary Table (Local Currency)
  • Index map
  • 8 more item(s)...

What's included

This report contains:

  • Document

    Rough

    XLS 813.50 KB

  • Document

    Rough

    PDF 2.80 MB