Asset report

Rumaila

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Rumaila has been the backbone of Iraq's production for over six decades. Located in the province of Basra production peaked at 1.7 million b/d in the late 1970s. However a lack of investment caused production to decline to 1 million b/d by 2009. BP and CNPC were awarded a Technical Services Contract (TSC) to redevelop the field in 2009. The aim of the contract is to increase production to 2.1 million b/d by 2019.

What's included

This report contains

  • Document

    Rumaila

    PDF 6.31 MB

  • Document

    Rumaila

    XLS 1.08 MB

  • Document

    Rumaila

    ZIP 7.23 MB

Table of contents

Tables and charts

This report includes 46 images and tables including:

Images

  • Index Map
  • North and South Rumaila
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Geology: Table 2
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Rumaila TSC Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Economic analysis: Table 7
  • Economic analysis: Table 8
  • Economic analysis: Table 9
  • Economic analysis: Table 10
  • Economic analysis: Table 11
  • Economic analysis: Table 12
  • Infrastructure: Table 1

You may be interested in

Asset report

Tuba

Asset report

Qaiyarah and Najmah

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898