Asset Report

SC 38 (Malampaya/Camago)

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The key Malampaya gas field fuels around 20% of Luzon's power generation. Malampaya's importance as an energy source is further heightened by it being the only onstream gas field in the Philippines. The area covered by Service Contract 38 (SC38) contains the gas, condensate, and oil discoveries of Malampaya, Camago, and San Martin. In 1997 and 1998, gas sales and purchase agreements (GSPAs) with National Power Corporation (NPC) and First Gen enabled the development of the country's first, and so far the only major gas project. Under Shell's operatorship, the deep water Malampaya field was developed via subsea completions tied back to a processing platform in shallow water. Gas is exported via a 504 km subsea pipeline to a gas processing plant at Tabangao, Batangas in South Luzon. An onshore gas transmission system routes the gas from Tabangao to multiple gas-fired power plants.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Malampaya-Camago
      • Original participation - Occidental and Shell
      • Chevron and PNOC farm-in
      • Chevron divests to Udenna Corporation
      • Shell divests to Prime Energy
    • Camago-Malampaya Oil Leg (CMOL)
      • Historical participation
  • Geology
  • Well data
    • Planned activities
    • Historical activities
      • Phillips Petroleum
      • Occidental
      • Shell
      • Malampaya discovery
      • Post-1995 activities
      • Post-1995 activities - Camago-Malampaya oil leg (CMOL)
  • Reserves and resources
    • 2000-2009 - Phase 1
    • 2010-2019 - Phase 2 and 3
    • 2020-2023 - Production decline
    • Post-2023 - Phase 4
    • Key development metrics
      • Wells
      • Offshore facilities
    • Development history
      • Phase 1
      • Phase 2
      • Phase 3
      • Maintenance contracts
    • Offshore Gas
    • Onshore Gas
    • Condensate
    • Proposed Batangas to Manila (BatMan) pipeline
    • Exploration Costs
    • Capital Costs
      • Historical capex
      • Phase 4
    • Operating Costs
  • 4 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Infrastructure: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • 14 more item(s)...

What's included

This report contains:

  • Document

    SC 38 (Malampaya/Camago)

    PDF 7.33 MB

  • Document

    SC 38 (Malampaya/Camago)

    XLS 890.50 KB