Shaybah
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Structure
- Source
- Reservoir
- Oil
- Gas
- Oil
- Gas and NGLs
- Emissions
-
Phase 1 oil
- Surface production facilities
- Shaybah-Abqaiq export pipeline
- Field infrastructure facilities
- Downstream processing facilities
- Development drilling
- Phase 2 crude capacity expansion
- 12 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reservoir CharacteristicsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Shaybah Production ProfilePipeline SummaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)
- 8 more item(s)...
What's included
This report contains: