Asset Report
SK310 (LNG)
Report summary
The SK310 PSC contains three gas fields which were discovered between 2010 and 2014. The fields, all pinnacle reef carbonate structures, are expected to be developed to supply the Bintulu LNG complex.The B15 field is expected to be brought onstream first, through a central processing platform (CPP), tied back to the B11 field.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- Emissions
-
Development
- Key Development Metrics
- Infrastructure
-
Costs
- Exploration costs
- Capital costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM file)
- Economic analysis
Tables and charts
This report includes 25 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Well data: Table 1
- Exploration: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production Profile
- Sales contracts: Table 1
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Fiscal and regulatory: Table 3
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Costs: Table 1
- Costs: Table 2
- Operating costs
What's included
This report contains:
Other reports you may be interested in
Asset Report
MLNG Dua - Commercial Overview
The second MLNG project (MLNG Dua) started operations in 1995 at the MLNG complex in Bintulu, in the Malaysian state of Sarawak. Other ...
$2,250
Asset Report
MLNG - Commercial Overview
The first MLNG project (MLNG Satu) started operations in January 1983 at the MLNG complex in Bintulu, in the Malaysian state of ...
$2,250
Asset Report
Shanghai - LNG regas terminal
The owner of the terminal, Shanghai LNG, is a joint venture between CNOOC Gas and Power (45%) and Shenergy Group (55%), the Shanghai ...
$1,200