Asset Report

Surat Gas Project (Arrow)

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Surat Gas Project is a coal seam gas development in the Surat Basin, southeast Queensland. The project is operated by Arrow Energy, a joint venture between Shell (50%) and PetroChina (50%). Production from the Kogan, Tipton West and Daandine fields started in the early 2000s. In April 2020 the first phase of the Surat Gas Project was sanctioned. This phase will require between 700 and 800 wells, delivering up to 250 mmcfd to QCLNG. There is potential for a further four additional phases that could produce around 685 mmcfd (4.4 mmtpa) at peak.

Table of contents

  • Summary
  • Key Issues
    • QCLNG GSA
    • Domestic gas
    • Legacy production
    • Development plan
    • Well design
    • Timeline
    • Number of wells modelled
    • Well performance (EUR) assumed
    • Average water production per well modelled
    • Future development
    • Production Facilities and in field compression
    • 12 more item(s)...
  • Cash flow
  • Cash Flow
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Detail Map
  • Participation
  • Reserves (2P) at 01/01/2025
  • Contingent Resources (2C) at 01/01/2025
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
  • 9 more item(s)...

What's included

This report contains:

  • Document

    Surat Gas Project (Arrow)

    XLS 838.00 KB

  • Document

    Surat Gas Project (Arrow)

    PDF 2.08 MB