Asset Report

Tilenga (Blocks 1 and 2)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Tilenga forms part of the Lake Albert development located in northwest Uganda. It comprises three blocks, split into two projects: Tilenga (Blocks 1 and 2) operated by TotalEnergies and Kingfisher (Block 3A) operated by CNOOC Ltd. Both are being developed concurrently and will rely on the East Africa Crude Oil Pipeline (EACOP) to evacuate over 1 billion barrels of crude oil. Final investment decision (FID) for the upstream project was in February 2022. The operator is targeting first oil in ...

Table of contents

Tables and charts

This report includes 33 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Tilenga map
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Block 1 Production Profile
  • Block 2 Production Profile
  • Infrastructure: Table 1
  • Participation: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Tilenga (Blocks 1 and 2)

    PDF 8.58 MB