Udmurtneft Fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Key development metrics
- Wells
- Infrastructure
- Capital Costs
- Operating Costs
- Cash Flow
- Transport
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapUdmurtneft (North)Udmurtneft (South)
-
ParticipationFields and producing horizonsField reservoir characteristicsField oil qualityReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2016-2025)Production profileCapital Costs Pre-2017 to 2025 (US$ million)
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
CNPC Ai-Dan Munai
CNPC has operated the Ai-Dan Munai oil project since 2005. It initially consisted of two legacy fields, Arisskoye and Blinovskoye, in ...
$3,720Turgai Petroleum
Turgai Petroleum, a 50:50 JV between PetroKazakhstan and KVK-Petroleum, operates the mature Kumkol North and East Kumkol oil fields in ...
$5,280Frostpipe
The Frostpipe was constructed to transport condensate and oil from the Lille Frigg and Frøy fields to the Oseberg field.
$2,580