Yamal LNG - Upstream
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Tambeigaz
- NOVATEK's re-entry
- Foreign investors farm-in
- Reporting
- Geology
- Exploration
- Reserves and resources
-
Production
- LNG output
-
Development
-
Key development metrics
- Wells
- Infrastructure
- Liquefaction
- Modules fabrication
- Drilling
- Other infrastructure
- Port infrastructure
- Liquefaction
-
Key development metrics
-
Infrastructure
- Shipping
-
Costs
-
Capital costs
- Financing
- Operating costs
-
Capital costs
- Sales contracts
- 3 more item(s)...
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Index map
- South Tambeiskoye map
- Geology: Table 1
- Geology: Table 2
- Reserves and resources: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2025
- 9 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Yemen LNG - Upstream
Yemen LNG (YLNG) project consists of two identical trains, each with a production capacity of 3.35 mmtpa. The LNG plant is located at ...
$3,720RasGas II (LNG) - Upstream
RasGas II is an integrated North Field LNG project. The LNG plant consists of three 4.7 mmtpa trains (Trains 3, 4 & 5). Train 3 ...
$3,720Qatargas 4 (LNG) - upstream
Qatargas-4 is a fully integrated North Field LNG project. It was developed jointly with Qatargas-3, and both projects include identical ...
$3,720