Asset Report

Zhuangxi Buried Hill EOR (Ceased)

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Zhuangxi Buried Hill EOR contract involves the re-development of the onshore Zhuangxi Buried Hill oilfield, which has high-temperature and fractured basement reservoirs and complex geology. The 20-year PSC was signed between Genting Oil and Gas (Genting) and Sinopec in October 2002 after encouraging results from a three-year evaluation program conducted by Genting from 1999 to 2002.

Table of contents

  • Summary
  • Key Issues
  • Evaluation Phase
  • Production Phase
  • Capital Costs
  • Cash Flow
  • Global Economic Model (GEM) file
  • Cash Flow

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Detail Map
  • Participation
  • Field Hydrocarbon Characteristics
  • Reserves (2P) at 01/01/2025
  • Production (2015-2024)
  • Production Profile
  • Capital Costs Pre-2016 to 2024 (US$ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • 5 more item(s)...

What's included

This report contains:

  • Document

    Zhuangxi Buried Hill EOR (Ceased)

    XLS 603.00 KB

  • Document

    Zhuangxi Buried Hill EOR (Ceased)

    PDF 2.15 MB