Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Altonorte copper smelter
The smelter is located near Antofagasta and it uses the Noranda reactor technology. The smelter capacity is 1.2Mt/a conc (349kt/a copper) and its s...
Caletones copper smelter
The smelter is located near the city of Rancagua, Chile. The capacity of the smelter is 1.4Mt conc/a (435kt/a copper). The capacity of each Tenient...
Lucky Break nickel project
The Lucky Break nickel project, located 140 km west of Townsville is a joint venture between Metals Finance Limited and Metallica Minerals Limited....
Luoping zinc smelter
The Luoping zinc smelter was built in 1995 with a capacity of 12kt/a slab zinc and has expanded over the years to the current 120kt/a capacity. How...
Baiyin No.3 zinc smelter
The original capacity of the No3 Smelter was 35kt/a zinc. In 2001 a major smelter renovation plan was instigated with the intention of raising the ...
Kunming zinc smelter
The original Kunming zinc smelter had a capacity of 10kt/a and was commissioned in 1985. Work was started in 2000 to expand the zinc smelter to a n...
Viewing page 285 of 471