Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Uralsk (P) aluminium smelter
The prebake lines were commissioned in 1994 to eventually replace the Søderberg lines, which came online in 1939. The Søderberg lines closed in 200...
Uralsk (S) aluminium smelter
The Søderberg lines were closed in 2009. Uralsk is now an exclusively prebake technology operation. Wood Mackenzie’s asset reports are built from t...
Veles zinc smelter
The ISF smelter at Veles was commissioned in October 1973 with a capacity of 65kt/a ISF zinc and 35kt/a lead. In June 2003 the smelter was "tempora...
Veracruz aluminium smelter
The smelter was commissioned in 1963 and sourced its alumina from the US and Venezuela. Products included billet and ingot. The plant was high cost...
Viga iron ore mine
Viga is a mid-sized surface mine owned and operated by Vale located near the town of Congonhas in Minas Gerais state, Brazil. The operation produce...
Visakhapatnam steel plant
RINL operates the Visakhapatnam steel plant which is located along India’s southeast coast. The site is also referred to as the Vizag Steel plant a...
Viewing page 405 of 450