Asset Report
Mehdiabad zinc mine project
Report summary
The Mehdiabad zinc project is located in central Iran, mining will be in a staged open pit development. There have been a number of options over the years for the treatment of the oxide and sulphide ores. The accompanying profile assumes the latest proposed plan to produce zinc and lead concentrates. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry-standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Emissions
- CAPEX
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Mehdiabad Project Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Namib zinc mine project
A detailed analysis of the Namib zinc mine project
$2,250
Asset Report
Prairie Creek zinc mine project
A detailed analysis of the Prairie Creek zinc mine project.
$2,250
Asset Report
Ozernoye zinc mine project
A detailed analysis of the Ozernoye zinc mine project.
$2,250