Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Most popular reports
Metals costs reports
Portovesme (ISF) zinc smelter
The Porto Vesme ISF was commissioned in 1972 with a design capacity of 72kt/a zinc. In 1995, the ISF was uprated by enlarging the hearth and shaft ...
Vishakhapatnam zinc smelter
The Vishakhapatnam (Vizag) zinc smelter was commissioned in 1977 specifically to treat imported concentrates. The capacity at commissioning was 30k...
Warrego Tailings (Closed) gold mine
The treatment plant was constructed to process tailings from the Warrego copper-gold mine, which ceased operation in 1989 on depletion of reserves....
Avilés aluminium smelter
Commissioned in 1959, the smelter is one of three in Alcoa's Spanish portfolio. Alumina is sourced directly from the San Ciprián refinery to the we...
Sichuan Qiya (E'meishan) aluminium smelter
The smelter was originally commissioned in the late 1990s as a Søderberg operation. It was later converted to prebake. Wood Mackenzie’s asset repor...
Ikot Abasi aluminium smelter
The smelter project was conceived by the Nigerian Federal Government in order to utilise the abundant gas reserves in the area. We expect that the ...
Viewing page 466 of 470