Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Ikot Abasi aluminium smelter
The smelter project was conceived by the Nigerian Federal Government in order to utilise the abundant gas reserves in the area. We expect that the ...
Isle-Maligne aluminium smelter
Production ended in 2000. Capacity was replaced by Alma. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of gra...
Itaguai zinc smelter
Companhia Mercantile Industrial Inga (CMI) was formed in 1940 as a galvanised pipe manufacturer but it was not until 1965 that the plant at Itaguai...
Jinchengjiang Chengyuan zinc smelter
The Jinchengjiang Chengyuan smelter began operations in 1996 and is privately owned but operated by Chengyuan Mining & Smelting Co. Ltd. The site i...
Jinshan zinc smelter
The Jinshan smelter was commissioned in 2010 with a capacity of 60kt/a. Unlike many Chinese smelters, Jinshan uses mainly low grade oxide ore, from...
Jonquière (Arvida) (S) aluminium smelter
Jonquière was the second aluminium smelter to be built in Canada. Søderberg production ended in 2004. The closure of the Søderberg lines at Jonquiè...
Viewing page 439 of 448