Russia and the Caspian outlook reports
Browse our Russian and the Caspian outlook reports to empower your strategic business decisions. Achieve more with short-term and long-term forecasts on the major commodity markets. Access cutting-edge analysis with our outlook reports and support your decision-making.
Purchase by credit card or invoice
Russia and the Caspian outlook reports
Irkutsk (P) aluminium smelter
Irkutsk operates both Søderberg and prebake cell technology. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of...
Irkutsk (S) aluminium smelter
Irkutsk operates both Søderberg and prebake cell technology. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of...
Khakas aluminium smelter
The Khakas smelter (previously known as Sayanogorsk-2) was the first big smelter project of the post-Soviet era. The smelter is essentially an expa...
Volkhov aluminium smelter
The Volkhov smelter was permanently closed in 2013, although the casthouse was kept in operation. At the time of its closure, the smelter was (by s...
Taishet aluminium smelter
Taishet will be configured in two lines, both with two rooms containing 176 cells per room (a total of 704 cells), and will utilise RA-400 technolo...
Novokuznetsk aluminium smelter
Novokuznetsk was the first aluminium smelter to be built in Siberia. Novokuznetsk comprises two separate plants, NkAZ-1 and NkAZ-2, located 1.6km d...
Viewing page 88 of 112