wn1sdwk000IN4
Sign-in to our platforms to access our extensive research, our latest insight, data and analytics and to connect to our industry experts.
The reserves shown in the table above reflect upstream supply volumes that are currently modelled. In our LNG supply forecast we expect ...
The NLNG plant is supplied with feedgas from five gas gathering networks: GTS1 through to 5
Nigeria LNG (NLNG) is a non-integrated LNG supply project with a current total capacity of 22 mmtpa. NLNG 7 - sanctioned in December ...
NLNG Six involved the construction of the sixth train at NLNG, increasing total capacity to 22.2 mmtpa
The Plus project exports 8.1 mmtpa with additional LPG export capacity
NLNG Base is a two train LNG plant, which was the first to export LNG from Nigeria in 1999.
In 2002 a third train at NLNG started production. This expansion included an LPG plant, allowing wet gas to be accepted for the first time.
Brass LNG is a proposed 2-train 10 mmtpa greenfield project in the Niger Delta next to the Brass River oil terminal. It has a segmented ...
Viewing page 1 of 1