Asset Report
Arutmin Satui coal mine
Report summary
Arutmin comprises five separate operations - Mulia, Satui, Senakin, Sarongga and Batulicin - which are all located in South Kalimantan. The Satui deposits stretch over 40 kilometres and run parallel with coast in South Kalimantan, approximately 20 kilometres inland. This concession operated under a first-generation Coal Cooperation Agreement, which was awarded in November 1981. In November 2020, the concession was converted to a Special Mining Business License (IUPK) Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry-standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
Tables and charts
This report includes 14 images and tables including:
- Arutmin Satui Emission Intensity Quartile ranking – total global production - saleable tonnes
- Detailed map
- Participation
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Asset Report
Arutmin Sarongga coal mine
A detailed analysis of the Arutmin Sarongga coal mine.
$2,550
Asset Report
Arutmin Mulia coal mine
A detailed analysis of the Arutmin Mulia coal mine.
$2,550
Asset Report
Arutmin Batulicin coal mine
A detailed analysis of the Arutmin Batulicin coal mine.
$2,550